Most WaterMark rejections we see are not about whether the product is any good. They are about paperwork decisions made before the first test was commissioned — and by then the money is already spent.

This guide separates two things that are easy to conflate: what the Plumbing Code actually requires of your product, and where applications tend to come apart procedurally. The first is verified fact; the second is the certification scheme’s own rules plus field experience.

Verified facts this guide rests on

WaterMark certification is mandatory for plumbing and drainage products listed on the WaterMark Schedule of Products before a licensed plumber may lawfully install them under the Plumbing Code of Australia. Products on the Schedule of Excluded Products are outside the scheme; a product on neither schedule requires a risk assessment by a WaterMark Conformity Assessment Body.
Source: NCC 2025 Volume Three Clause A5G4; ABCB WaterMark Scheme · last verified 2026-06-14
Any plumbing product intended for contact with drinking water must comply with AS/NZS 4020 regardless of its material, under NCC 2025 Volume Three Clause A5G4(1). Only the wetted components fall within the standard’s scope; non-wetted housings are excluded.
Source: NCC 2025 Volume Three Clause A5G4; AS/NZS 4020:2018 · last verified 2026-06-14
A copper-alloy plumbing product intended for contact with drinking water must have a weighted average lead content of not more than 0.25 percent, under NCC 2025 Volume Three Clause A5G4(2). Standard high-lead brasses such as C36000 free-machining brass, typically 2.5 to 3.7 percent lead, cannot meet that threshold and must be substituted before certification can proceed.
Source: NCC 2025 Volume Three Clause A5G4(2); AS/NZS 4020:2018 · last verified 2026-06-13

First: does WaterMark even apply to your product?

WaterMark certification is mandatory for plumbing and drainage products on the WaterMark Schedule of Products (WMSP) before a licensed plumber may lawfully install them under the Plumbing Code of Australia. Products on the Schedule of Excluded Products (WMEP) are explicitly out of scope.

A product that appears on neither schedule is not automatically exempt. It has to go through a risk assessment by a WaterMark Conformity Assessment Body (WMCAB) to determine whether certification is required or whether it should be added to the excluded list.

The two product requirements that catch people out

Any product intended for contact with drinking water must comply with AS/NZS 4020, regardless of what it is made of. NCC 2025 Volume Three Clause A5G4(1) sets this out. Acceptable evidence is either a test report from an Accredited Testing Laboratory to AS/NZS 4020, or a WaterMark Licence whose product specification already includes AS/NZS 4020 compliance. Only the wetted components need testing — non-wetted housings are outside the standard’s scope.

Copper-alloy products in contact with drinking water carry a second, separate requirement: a weighted average lead content of not more than 0.25% (Lead Free), under NCC 2025 Volume Three Clause A5G4(2). Evidence is an Accredited Testing Laboratory report to NSF/ANSI 372 or NSF/ANSI 61 Annex G, or a WaterMark Licence whose specification reflects the lead-content requirement.

Seven ways applications come apart

  1. Wrong scheme entirely. The product turns out to be on the WMEP, or has no applicable specification (WMTS/AS) on the WMSP. Where no specification exists, the Approved Certifier cannot evaluate the product until a new one is approved through the WMTAC process (Section 8.4.3).
  2. Risk assessment for a new specification is rejected. The assessment lacks detail, uses wrong Consequence/Likelihood ratings, or fails the risk-rating threshold — rejected in writing under Section 8.4.1. Appendix 3 sets out the protocol; the consequence rating has to cite concrete health, safety or water-wastage impacts rather than abstractions.
  3. Test report from a laboratory that is not accredited, or is accredited but not under the ILAC Mutual Recognition Arrangement. Section 8.5.I requires testing by an accredited laboratory with results acceptable to the Approved Certifier. Verify ILAC MRA status and cross-check the NATA register before commissioning tests, and agree the test plan — including the exact specification edition — with the WMCAB first.
  4. Factory assessment fails at one of several sites. Section 8.5.I.a requires on-site assessment of the quality system and production process at each location. One site failing halts certification or invalidates the Licence for products made there — so list every manufacturing location at application stage, and make sure traceability records and batch release testing match the documented system at all of them.
  5. Undeclared change to design, material, process or location. Sections 8.6.1 and 8.10.6.d require the annual declaration to confirm there has been no such change. An undeclared change breaches the Approved User Agreement; the certifier may suspend or withdraw the certificate and Licence (Section 8.13.3), and product made under the changed configuration is non-compliant supply.
  6. Scope-of-use mismatch. The certificate is issued for a defined Scope of Use — "cold water only", "max 500 kPa", "indoor use" — but marketing or distributors claim broader use. The certificate stays valid while the installation does not (Section 9.1.1), and inspectors can reject it on site. Ask for the widest scope your test evidence supports: narrowing later is easy, broadening needs re-evaluation.
  7. Product variants shipped without an Extension of Scope. A new size, alternative material, or new model number shipped under the existing certificate. Section 8.6 requires an application for any additional product type, even to the same specified requirements. Discovery during surveillance triggers a critical non-conformity (Section 11.5.2.a) — halt of production, recall of distributed stock, possible Licence suspension.

What the cost and delay numbers are worth

The useful conclusion is not the dollar figure. It is the ordering: every one of the seven patterns is cheap to prevent at pre-assessment and expensive to fix after testing has started. Scope checks and laboratory accreditation checks cost an afternoon.

What this means if you manufacture outside Australia

  • Testing can be done offshore, but only at a laboratory that is accredited and inside the ILAC MRA. Confirm this in writing before you pay for a single test.
  • Every factory that will make the product gets assessed — not just the one you show first. Sub-contracted or second-shift sites count.
  • Certification tracks a configuration, not a company. Changing a supplier, a formulation, a production line or a site is a notifiable event even when it looks minor to you.
  • If any wetted part is copper alloy, resolve the lead question before anything else. It can invalidate the whole plan.

Frequently Asked Questions

Can a Chinese factory hold the WaterMark certificate directly?

The certificate is issued to the Approved User for a defined product configuration made at assessed locations. The practical constraint is not nationality but assessability: every manufacturing site must be assessed on-site, and the holder must be able to meet ongoing surveillance and annual declaration obligations. Confirm the arrangement with your chosen WMCAB before applying.

My product is not on the WMSP. Does that mean I do not need WaterMark?

No. Not being listed is not the same as being excluded. Products on neither schedule go through a WMCAB risk assessment, which decides whether certification is required or whether the product belongs on the excluded list.

I already have an AS/NZS 4020 report. Is that enough?

It covers one requirement, from an accredited laboratory, for the wetted components. It does not by itself address the applicable product specification, the factory assessment, or — for copper alloys — the separate lead-content requirement under A5G4(2).

We changed a raw material supplier but the product is identical. Do we have to tell anyone?

Yes. The annual declaration has to confirm no change to design, material, manufacturing process or location. Build the notification into a change-control procedure rather than deciding case by case whether a change is "minor" — that judgement is what Section 8.13.3 suspensions are made of.

How long does WaterMark certification take?

There is no single answer worth quoting, and any agent who gives you one without seeing your product specification and site list is guessing. What is predictable is the ordering: the schedule check and laboratory accreditation check come first and cost almost nothing; a missing specification or a failed site audit is what turns months into quarters.

Not sure if your product is in scope?

Run the free pre-check — map your product to AS/NZS standards and see your main rejection risks in under 2 minutes.

Free Pre-Check →